Performance Management - Performance Based Actions
Questions and answers
If neither the performance standards nor the retention level communicated to the employee at the start of the PIP have changed, the agency should be able to proceed with the opportunity period or PIP. However, a substantive change in standards or the retention level would require that the current PIP end.